Western Railway Medha EMU local trainRepresentational image. (Photo: Anonymousboii / Wikimedia Commons, CC BY-SA 4.0)

MUMBAI: The Railway Board’s Project Evaluation Committee has approved a direct suburban rail line between Panvel and Vasai-Virar, Marathi daily Lokmat reported. Once built, the line will spare commuters the change of trains at Kurla or Dadar.

At present, commuters travelling between Panvel and Vasai-Virar have to change locals at Kurla or Dadar. The new line will offer a direct ride via Navi Mumbai and Bhiwandi.

69.23 km, 17 stations

The 69.23 km route will have 17 stations, with about 28 km of it elevated. The project comes under the Mumbai Urban Transport Project (MUTP) 3B and is estimated to cost ₹12,710.82 crore.

Panvel railway station board
Panvel railway station. (Photo: Superfast1111 / Wikimedia Commons, CC BY-SA 3.0)

‘Will link eastern and western suburbs’

Vilas Wadekar, chairman and managing director of the Mumbai Railway Vikas Corporation (MRVC), told Lokmat that the line will link the eastern and western suburbs and serve fast-growing urban and industrial areas along the route.

Vasai Road railway station board
Vasai Road railway station. (Photo: Superfast1111 / Wikimedia Commons, CC BY-SA 3.0)

Two approvals still pending

The state government has already given its in-principle approval. Approvals from NITI Aayog and the Union finance ministry are still awaited. Tenders will then be floated and a contractor appointed before work begins. MRVC will carry out the project.

Top photo: Representational image (Anonymousboii / Wikimedia Commons, CC BY-SA 4.0)

Leave a Reply

Your email address will not be published. Required fields are marked *