THANE: The first train for Mumbai Metro Line 5 has entered the Mumbai Metropolitan Region Development Authority’s (MMRDA) Kasheli Depot, marking a key milestone in preparing the Thane–Bhiwandi–Kalyan corridor for passenger service.
MMRDA shared the update, along with photographs of the train at the depot, on its official X handle.

Where Line 5 trains will be looked after
Kasheli will be the base for the corridor’s fleet. Trains for Metro Line 5 will be parked, inspected, tested and maintained at the depot.
Work on the depot is still going on, but the facilities needed to receive trains are already in place. The coach loading and unloading platform and a temporary inspection bay have been completed, allowing the depot to take in trains and carry out their initial checks.

27-hectare depot with room for 30 trainsets
Spread across 27 hectares, the depot is designed to hold around 30 trainsets. It will have five inspection lines, four workshop lines, a dedicated test track and train washing facilities.

According to MMRDA, these facilities will help keep the Line 5 fleet ready for daily passenger service once the corridor opens.

Also on our Instagram:
View this post on Instagram


