Airoli Bridge Segment Launching to Cause Traffic Restrictions from May 3 to June 1

Navi Mumbai: The Turbhe Traffic Division of the Navi Mumbai Police has announced a month-long traffic diversion on the Mumbai-bound lane of the Uran Phata Bridge on the Sion-Panvel Highway to facilitate cement concreting work.

According to the official notification, the roadwork will take place from February 22, 2025, to March 22, 2025. To ensure a smooth flow of traffic, commuters are advised to use the following alternative routes:

  • Pune to Mumbai: Take the Panvel Exit via Atal Setu towards Mumbai.
  • Kalamboli to Mumbai: Take a left turn under the CBD Bridge and proceed via Killa Junction and Palm Beach Road.
  • Pune to Thane: Use the Kalamboli Circle and Kon Phata route towards Thane.

The Navi Mumbai Traffic Police has urged motorists to follow the advisory and cooperate to minimize congestion during this period.

By The Times of Mumbai Team

The news desk of The Times Of Mumbai, reporting on civic issues, transport, health, business, the environment and education across the Mumbai Metropolitan Region.

Leave a Reply

Your email address will not be published. Required fields are marked *