Cable-Stayed Bridge on SCLR Extension to Open in Mumbai on August 14

Date:

This bridge is a South Asia’s first cable-stayed bridge with a 100-metre horizontal curve.

Mumbai: The construction of the cable-stayed bridge on the Santacruz–Chembur Link Road (SCLR) extension, being developed by the MMRDA, has been completed. The bridge was initially scheduled to open for traffic before the monsoon, but it will now be inaugurated on August 14.

Technically, this bridge holds a special distinction — it is South Asia’s first cable-stayed bridge with a 100-metre horizontal curve. The structure is 215 metres long, with an orthotropic steel deck and a height of 25 metres from the ground, passing over the Western Express Highway. Its width ranges from 10.5 to 17.2 metres, accommodating two lanes. The Y-shaped pylon design has been specially crafted to ensure the safety of Metro Line 3 and underground utility services.

Also Read

Once operational, the bridge will enable signal-free travel from Kurla directly to Panbai School and the airport. It will also provide seamless connectivity between the Eastern Express Highway and the Western Express Highway, easing traffic on Vakola, BKC, and LBS Road. The project is expected to reduce travel time, save fuel, and boost east–west connectivity in the city.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related

25 Women Rescued From Fake Dance Academy: Harmony Foundation Praises Maha Police

A major human trafficking and prostitution racket operating under...

Shrikant Shinde Demands 15-Coach Local Trains, Marathi Literature Stalls at Railway Stations

Kalyan MP Shrikant Shinde on Tuesday raised significant demands...

Thane Deputy Mayor Flags Dangerous Speed Breakers, Urges Citywide Audit

In Thane, concerns over unauthorized and dangerous speed breakers...