Central Railway Announces Special Traffic and Power Blocks at Kasara

Date:

The Central Railway will conduct special traffic and power blocks for the launching of a ROB girder (Phase I) at Kasara station on March 8 and 9, 2025.

The first block will take place on March 8 from 11:40 AM to 12:10 PM, affecting both Up and Down North East lines within Kasara station limits. On March 9, two blocks will be implemented: the second from 11:40 AM to 12:10 PM and the third from 4:00 PM to 4:25 PM. These blocks will impact train operations on both Up and Down North East lines.

Due to these blocks, Kasara local (N-11), departing from CSMT at 9:34 AM on March 8 and 9, will be short-terminated at Asangaon. Similarly, Kasara local (N-19), leaving CSMT at 1:10 PM on March 9, will be short-terminated at Kalyan.

The local for CSMT (N-16), scheduled to depart from Kasara at 11:10 AM on March 8 and 9, will short-originate from Asangaon. Likewise, the local for CSMT (N-26), set to leave Kasara at 4:16 PM on March 9, will short-originate from Kalyan.

These maintenance mega blocks are essential for infrastructure upkeep and passenger safety. The Railway Administration requests passengers to bear with the inconvenience caused.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related

KDMC Surveys 4.15 Lakh Households For Women-Focused Cancer Screening

So far, over 4.10 lakh women from nearly 4.15...

Former Kalyan Rural MLA Subhash Bhoir Joins BJP

Major Blow to Shiv Sena (UBT) Ahead of Thane...

Stroke Cases Surge in Mumbai: 50–60 Daily, Delayed Treatment Fuels Disability

In India, there are 119-145 stroke cases per 1...

Traffic Jams to End in MMR: MMRDA to Appoint Expert Committee

To address traffic congestion, drone and AI-based traffic management...