Central Railway Announces Special Traffic and Power Blocks at Kasara

Date:

The Central Railway will conduct special traffic and power blocks for the launching of a ROB girder (Phase I) at Kasara station on March 8 and 9, 2025.

The first block will take place on March 8 from 11:40 AM to 12:10 PM, affecting both Up and Down North East lines within Kasara station limits. On March 9, two blocks will be implemented: the second from 11:40 AM to 12:10 PM and the third from 4:00 PM to 4:25 PM. These blocks will impact train operations on both Up and Down North East lines.

Due to these blocks, Kasara local (N-11), departing from CSMT at 9:34 AM on March 8 and 9, will be short-terminated at Asangaon. Similarly, Kasara local (N-19), leaving CSMT at 1:10 PM on March 9, will be short-terminated at Kalyan.

The local for CSMT (N-16), scheduled to depart from Kasara at 11:10 AM on March 8 and 9, will short-originate from Asangaon. Likewise, the local for CSMT (N-26), set to leave Kasara at 4:16 PM on March 9, will short-originate from Kalyan.

These maintenance mega blocks are essential for infrastructure upkeep and passenger safety. The Railway Administration requests passengers to bear with the inconvenience caused.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related

Only 5% of Train Accident Victims’ Families Receive Compensation in 10 Years

Only 1,408 of the 26,547 people who died while...

Three in Five Liver Cancer Cases Are Preventable, Says Lancet Report

Three in five liver cancer cases are preventable if...

Titan Raga Unveils ‘Cocktails’ Collection: Celebrating Shine, Style, and Strength

This collection celebrates the sharp, vibrant personality of the...

Acquittals in 7/11 blasts case exposes a major failure of the criminal justice system; Abraham Mathai

Dr. Abraham Mathai, Founder-Chairman of the Harmony Foundation, has...