Central Railway Announces Special Traffic and Power Blocks at Kasara

Date:

The Central Railway will conduct special traffic and power blocks for the launching of a ROB girder (Phase I) at Kasara station on March 8 and 9, 2025.

The first block will take place on March 8 from 11:40 AM to 12:10 PM, affecting both Up and Down North East lines within Kasara station limits. On March 9, two blocks will be implemented: the second from 11:40 AM to 12:10 PM and the third from 4:00 PM to 4:25 PM. These blocks will impact train operations on both Up and Down North East lines.

Due to these blocks, Kasara local (N-11), departing from CSMT at 9:34 AM on March 8 and 9, will be short-terminated at Asangaon. Similarly, Kasara local (N-19), leaving CSMT at 1:10 PM on March 9, will be short-terminated at Kalyan.

The local for CSMT (N-16), scheduled to depart from Kasara at 11:10 AM on March 8 and 9, will short-originate from Asangaon. Likewise, the local for CSMT (N-26), set to leave Kasara at 4:16 PM on March 9, will short-originate from Kalyan.

These maintenance mega blocks are essential for infrastructure upkeep and passenger safety. The Railway Administration requests passengers to bear with the inconvenience caused.

LEAVE A REPLY

Please enter your comment!
Please enter your name here

Share post:

Subscribe

Popular

More like this
Related

Air Fresheners Can Worsen Indoor Air Pollution

Most of us are familiar with outdoor air pollution,...

Desilting Scam: BMC Refutes Allegations of Irregularities in Drain Desilting Tenders

Mumbai: The Brihanmumbai Municipal Corporation (BMC) has denied allegations of...

Green Patch at Risk: Activists Alarmed as Construction Begins Despite Minister’s Assurance

Navi Mumbai: Despite State Forest Minister Ganesh Naik’s assurance to...

New Exam Schedule Sparks Outrage Among Teachers and Parents

The sudden changes in the annual exam and Progress...